| The roof framing and sheathing are now 1/2 installed. It is really beginning to look like something. |
| The doors, and windows have been installed, and grading is ready for the deck footers. |
| The deck is constructed complete with railing, flooring, and stairs. |
| In addition to all the work that is taking place on the outside, there is also work happening on the interior of the existing house. This wall will be removed, and new dividing columns will be installed making the existing sitting area feel larger. |
| The plaster has been torn away revealing a few surprise ducts. |
| The sitting area dividing wall is nearly complete. It is painted, and the trim is installed. |
| The siding is installed, the yard has been graded, and seeded. Now the main focus turns to the interiors finishes. There is still a lot of work yet to be done. |
| This pretty much covers the look of the interior. The framing members are all exposed, plywood serves as the floor, and the electrical is being installed. |
| All the drywall has been installed and taped. |
| The master bedroom on the 2nd floor has the drywall installed as well. |